YIYI Mesh Belt Flat Wire / Honeycomb Belt Production and Quality Control
How YIYI Mesh Belt makes and inspects the Flat Wire / Honeycomb Belt: Drawing approval → Trial production → Interface review → Mass production → Final inspection → Packing and records. This 19-page document shows the production and inspection steps at Ningjin Yiyi Mesh Belt Co., Ltd. with photographs and measurement examples. See how your Flat Wire / Honeycomb Belt is made and checked before it ships: drawing approval, trial production and first-article inspection, material testing, wooden-case packing and project records for repeat orders. Use it as a checklist of what to confirm with us before production.
Flat Wire / Honeycomb Belt on the official website →
Jump to what you need
Page 3Approval and inspection sequenceConfirm dimensions, materials and equipment interfaces.
Page 5Material inspection equipmentConfirm the applicable test method, acceptance criteria and required material records for each project.
Page 8Flat-strip punching and formingForm and punch the strip components to the approved mesh geometry.
Page 10Trial production and first-article inspectionCustomized orders undergo trial production and first-article inspection before mass production.
Page 11Belt construction and drive-interface reviewConfirm rod pitch, strip geometry and the drive arrangement together.
Page 12Surface condition inspectionInspect surface condition against the selected material and finish.


















Summary: what this 19-page production and quality control document covers
This YIYI Mesh Belt production and quality control document for the Flat Wire / Honeycomb Belt is published by Ningjin Yiyi Mesh Belt Co., Ltd. (Ningjin, Shandong, China). Each item links to the page in the flipbook above.
- Page 3 · Order Control: Approval and inspection sequence
- Page 4 · Material Preparation: Round-bar drawing
- Pages 5–7 · Material Control: Material inspection equipment; Flat-strip material preparation; Rod and flat-strip dimensional checks
- Pages 8–9 · Belt Production: Flat-strip punching and forming; Component preparation and belt assembly
- Page 10 · Before Mass Production: Trial production and first-article inspection
- Page 11 · Equipment Matching: Belt construction and drive-interface review
- Pages 12–15 · Final Quality Control: Surface condition inspection; Welded edge inspection; Clenched edge inspection; Finished belt dimensional inspection
- Pages 16–17 · Packing & Shipment: Protective packing and order identification; Wooden-case packing
- Page 18 · Traceability: Project records and repeat-order support
Key tables
| Stage | Control point |
|---|---|
| 01 Drawing approval | Confirm dimensions, materials and equipment interfaces. |
| 02 Trial production | Inspect the first article before mass production. |
| 03 Interface review | Review strip geometry, rod pitch and drive interfaces. |
| 04 Mass production | Check formed components, assembly and weld condition. |
| 05 Final inspection | Inspect the finished belt before shipment. |
| 06 Packing and records | Confirm packing requirements and retain order records. |
| Record | Purpose for the buyer |
|---|---|
| Approved drawing and revision | Maintain the agreed specification for manufacture and reorders. |
| Material and production records | Support order traceability and review of manufacturing history. |
| Inspection records and photographs | Review recorded checks against the agreed requirements. |
| Customer confirmations | Retain technical decisions and approved changes. |
Acceptance dimensions, tolerances and the records you need are agreed for each project.
FAQ
How is a custom Flat Wire / Honeycomb Belt order controlled from drawing to shipment?
01 Drawing approval: Confirm dimensions, materials and equipment interfaces. 02 Trial production: Inspect the first article before mass production. 03 Interface review: Review strip geometry, rod pitch and drive interfaces. 04 Mass production: Check formed components, assembly and weld condition. 05 Final inspection: Inspect the finished belt before shipment. 06 Packing and records: Confirm packing requirements and retain order records. (page 3)
Is the wire or rod for the Flat Wire / Honeycomb Belt prepared in-house?
Round-bar drawing is part of YIYI MESH BELT’s material preparation capability. Rod material and diameter are selected for the belt design and approved drawing. (page 4)
How is the material for the Flat Wire / Honeycomb Belt checked?
Equipment and checks shown: Alloy composition screening, Tensile testing equipment, Hardness testing equipment. Confirm the applicable test method, acceptance criteria and required material records for each project. (page 5)
Is there a trial production or first-article inspection?
Customized orders undergo trial production and first-article inspection before mass production. Use approved drawings for acceptance dimensions and tolerances. (page 10)
How is the Flat Wire / Honeycomb Belt matched to the equipment?
Confirm rod pitch, strip geometry and the drive arrangement together. Review sprocket geometry and mounting dimensions where required. (page 11)
What is checked in final quality control for the Flat Wire / Honeycomb Belt?
Surface condition inspection: Inspect surface condition against the selected material and finish. Welded edge inspection: Inspect the specified welded edge for weld condition and consistency. Clenched edge inspection: Inspect the clenched edge and rod-end geometry against the selected construction. (pages 12, 13, 14)
How is the belt packed for export?
Packing follows the agreed transport route and destination requirements. Wooden-case fabrication uses external suppliers. (page 17)
Text version of this document
Page 1. PRODUCTION & QUALITY CONTROL FLAT WIRE / HONEYCOMB BELT Manufacturing processes and project inspection PROVEN · STABLE · VERIFIED
Page 2. MANUFACTURER Manufacturing and project control Ningjin Yiyi Mesh Belt Co., Ltd. A manufacturer of metal conveyor belts and related conveyor components based in Ningjin, Shandong, China. Manufacturing experience since 1998. Current company established in 2008. Core belt forming, assembly, welding and inspection are managed in-house. Selected surface treatments and supporting components use external suppliers. YIYI MESH BELT manufacturing site
Page 3. ORDER CONTROL Approval and inspection sequence Stage Control point 01 Drawing approval Confirm dimensions, materials and equipment interfaces. 02 Trial production Inspect the first article before mass production. 03 Interface review Review strip geometry, rod pitch and drive interfaces. 04 Mass production Check formed components, assembly and weld condition. 05 Final inspection Inspect the finished belt before shipment. 06 Packing and records Confirm packing requirements and retain order records. Project drawings define the final configuration and inspection requirements.
Page 4. MATERIAL PREPARATION Round-bar drawing In-house rod preparation Round-bar drawing is part of YIYI MESH BELT’s material preparation capability. Project requirement Rod material and diameter are selected for the belt design and approved drawing.
Page 5. MATERIAL CONTROL Material inspection equipment Alloy composition screening Tensile testing equipment Hardness testing equipment Confirm the applicable test method, acceptance criteria and required material records for each project.
Page 6. MATERIAL CONTROL Flat-strip material preparation Flat-strip stock Material preparation Confirm strip material, thickness and height for the selected belt construction.
Page 7. MATERIAL CONTROL Rod and flat-strip dimensional checks Rod diameter measurement Strip thickness measurement Check rod diameter and strip thickness against the approved specification. Agree dimensions and tolerances in mm / in.
Page 8. BELT PRODUCTION Flat-strip punching and forming Production equipment Forming workshop Form and punch the strip components to the approved mesh geometry.
Page 9. BELT PRODUCTION Component preparation and belt assembly Assemble formed strips and cross rods to the selected pitch, opening count and edge construction.
Page 10. BEFORE MASS PRODUCTION Trial production and first-article inspection Customized orders undergo trial production and first-article inspection before mass production. Use approved drawings for acceptance dimensions and tolerances.
Page 11. EQUIPMENT MATCHING Belt construction and drive-interface review Belt construction detail Edge and rod arrangement Confirm rod pitch, strip geometry and the drive arrangement together. Review sprocket geometry and mounting dimensions where required.
Page 12. FINAL QUALITY CONTROL Surface condition inspection Belt surface detail Finished belt surface Inspect surface condition against the selected material and finish. Where treatment is specified, re-inspection follows treatment; selected treatments use external suppliers.
Page 13. FINAL QUALITY CONTROL Welded edge inspection Welded edge detail Finished welded edge Inspect the specified welded edge for weld condition and consistency.
Page 14. FINAL QUALITY CONTROL Clenched edge inspection Clenched edge detail Rod-end arrangement Inspect the clenched edge and rod-end geometry against the selected construction.
Page 15. FINAL QUALITY CONTROL Finished belt dimensional inspection Check finished belt dimensions against the approved specification. Measurement photographs show project examples, not universal belt dimensions.
Page 16. PACKING & SHIPMENT Protective packing and order identification Protected belt Packing and identification Confirm belt protection, supplied accessories and packing requirements against the order before shipment.
Page 17. PACKING & SHIPMENT Wooden-case packing Packed shipment Wooden-case protection Packing follows the agreed transport route and destination requirements. Wooden-case fabrication uses external suppliers.
Page 18. TRACEABILITY Project records and repeat-order support Record Purpose for the buyer Approved drawing and revision Maintain the agreed specification for manufacture and reorders. Material and production records Support order traceability and review of manufacturing history. Inspection records and photographs Review recorded checks against the agreed requirements. Customer confirmations Retain technical decisions and approved changes. Agree the inspection documents you need before production. For replacement projects, include existing belt details, equipment geometry and operating conditions.
Page 19. PROVEN · STABLE · VERIFIED Metal Conveyor Belt Manufacturer Email: info@yiyimeshbelt.com Phone / WhatsApp: +86 134 5177 3742 Website: www.yiyimeshbelt.com www.yiyimeshbelts.com Company: Ningjin Yiyi Mesh Belt Co., Ltd. Send Your Drawing for Production Review Belt dimensions (mm / in) Equipment and drive geometry Material and operating conditions Inspection requirements Existing belt photos / sample Request an Engineering Review for OEMs & Professional Distributors