YIYI Mesh Belt Self-Stacking Belt Production and Quality Control
How YIYI Mesh Belt makes and inspects the Self-Stacking Belt: Drawing approval → Trial production → Matching verification → Mass production → Final inspection → Packing and records. This 21-page document shows the production and inspection steps at Ningjin Yiyi Mesh Belt Co., Ltd. with photographs and measurement examples. See how your Self-Stacking Belt is made and checked before it ships: drawing approval, trial production and first-article inspection, in-house wire drawing, material testing, in-process dimensional checks, drum matching checks, wooden-case packing and project records for repeat orders. Use it as a checklist of what to confirm with us before production.
Self-Stacking Belt on the official website →
Jump to what you need
Page 3Approval and inspection sequenceConfirm dimensions, materials and equipment interfaces.
Page 6Material inspection equipmentConfirm the applicable test method, acceptance criteria and required material records for each project.
Page 8Spiral wire formingWire is formed into spiral elements.
Page 12Trial production and first-article inspectionCustomized orders undergo trial production and first-article inspection before mass production.
Page 13Layer stacking and engagement verificationCheck engagement between adjacent belt layers before mass production.
Page 15Surface condition inspectionInspect surface condition against the selected material and finish.




















Summary: what this 21-page production and quality control document covers
This YIYI Mesh Belt production and quality control document for the Self-Stacking Belt is published by Ningjin Yiyi Mesh Belt Co., Ltd. (Ningjin, Shandong, China). Each item links to the page in the flipbook above.
- Page 3 · Order Control: Approval and inspection sequence
- Pages 4–5 · Material Preparation: Stainless steel wire drawing; Round-bar drawing
- Pages 6–7 · Material Control: Material inspection equipment; Wire and rod diameter checks
- Page 8 · Belt Production: Spiral wire forming
- Pages 9–10 · In-Process Control: Spiral forming inspection; Stacking plate angle inspection
- Page 11 · Belt Production: Belt assembly and straightening
- Page 12 · Before Mass Production: Trial production and first-article inspection
- Pages 13–14 · Equipment Matching: Layer stacking and engagement verification; Drum geometry verification
- Pages 15–17 · Final Quality Control: Surface condition inspection; Edge finish inspection; Finished belt dimensional inspection
- Pages 18–19 · Packing & Shipment: Protective packing and order identification; Wooden-case packing
- Page 20 · Traceability: Project records and repeat-order support
Key tables
| Stage | Control point |
|---|---|
| 01 Drawing approval | Confirm dimensions, materials and equipment interfaces. |
| 02 Trial production | Inspect the first article before mass production. |
| 03 Matching verification | Confirm stacking engagement and approved drum geometry. |
| 04 Mass production | Check formed components, assembly and weld condition. |
| 05 Final inspection | Inspect the finished belt before shipment. |
| 06 Packing and records | Confirm packing requirements and retain order records. |
| Record | Purpose for the buyer |
|---|---|
| Approved drawing and revision | Maintain the agreed specification for manufacture and reorders. |
| Material and production records | Support order traceability and review of manufacturing history. |
| Inspection records and photographs | Review recorded checks against the agreed requirements. |
| Customer confirmations | Retain technical decisions and approved changes. |
Acceptance dimensions, tolerances and the records you need are agreed for each project.
FAQ
How is a custom Self-Stacking Belt order controlled from drawing to shipment?
01 Drawing approval: Confirm dimensions, materials and equipment interfaces. 02 Trial production: Inspect the first article before mass production. 03 Matching verification: Confirm stacking engagement and approved drum geometry. 04 Mass production: Check formed components, assembly and weld condition. 05 Final inspection: Inspect the finished belt before shipment. 06 Packing and records: Confirm packing requirements and retain order records. (page 3)
Is the wire or rod for the Self-Stacking Belt prepared in-house?
Dedicated wire-drawing equipment supports the preparation of stainless steel wire for belt manufacture. Confirm the material grade and wire diameter against the approved specification. (page 4)
How is the material for the Self-Stacking Belt checked?
Equipment and checks shown: Alloy composition screening, Tensile testing equipment, Hardness testing equipment. Confirm the applicable test method, acceptance criteria and required material records for each project. (page 6)
Is there a trial production or first-article inspection?
Customized orders undergo trial production and first-article inspection before mass production. Use approved drawings for acceptance dimensions and tolerances. (page 12)
How is the Self-Stacking Belt matched to the equipment?
Check engagement between adjacent belt layers before mass production. Stacking geometry follows the approved equipment and belt design. (page 13)
What is checked in final quality control for the Self-Stacking Belt?
Surface condition inspection: Inspect surface condition against the selected material and finish. Edge finish inspection: Inspect the selected edge construction for connection condition, consistency and burrs against the agreed requirements. Finished belt dimensional inspection: Check finished belt dimensions against the approved specification. (pages 15, 16, 17)
How is the belt packed for export?
Packing follows the agreed transport route and destination requirements. Wooden-case fabrication uses external suppliers. (page 19)
Text version of this document
Page 1. PRODUCTION & QUALITY CONTROL SELF-STACKING BELT Manufacturing processes and project inspection PROVEN · STABLE · VERIFIED
Page 2. MANUFACTURER Manufacturing and project control Ningjin Yiyi Mesh Belt Co., Ltd. A manufacturer of metal conveyor belts and related conveyor components based in Ningjin, Shandong, China. Manufacturing experience since 1998. Current company established in 2008. Core belt forming, assembly, welding and inspection are managed in-house. Selected surface treatments and supporting components use external suppliers. YIYI MESH BELT manufacturing site
Page 3. ORDER CONTROL Approval and inspection sequence Stage Control point 01 Drawing approval Confirm dimensions, materials and equipment interfaces. 02 Trial production Inspect the first article before mass production. 03 Matching verification Confirm stacking engagement and approved drum geometry. 04 Mass production Check formed components, assembly and weld condition. 05 Final inspection Inspect the finished belt before shipment. 06 Packing and records Confirm packing requirements and retain order records. Project drawings define the final configuration and inspection requirements.
Page 4. MATERIAL PREPARATION Stainless steel wire drawing In-house wire preparation Dedicated wire-drawing equipment supports the preparation of stainless steel wire for belt manufacture. Project requirement Confirm the material grade and wire diameter against the approved specification.
Page 5. MATERIAL PREPARATION Round-bar drawing In-house rod preparation Round-bar drawing is part of YIYI MESH BELT’s material preparation capability. Project requirement Rod material and diameter are selected for the belt design and approved drawing.
Page 6. MATERIAL CONTROL Material inspection equipment Alloy composition screening Tensile testing equipment Hardness testing equipment Confirm the applicable test method, acceptance criteria and required material records for each project.
Page 7. MATERIAL CONTROL Wire and rod diameter checks Wire diameter measurement Rod diameter measurement Check wire and rod diameters against the approved specification. Agree dimensions and tolerances in mm / in for the project.
Page 8. BELT PRODUCTION Spiral wire forming Spiral forming equipment Production workshop Wire is formed into spiral elements. Confirm the mesh geometry and wire dimensions before batch production.
Page 9. IN-PROCESS CONTROL Spiral forming inspection Formed spiral measurement Spiral geometry check Trial pieces are checked against the approved geometry before continuing production.
Page 10. IN-PROCESS CONTROL Stacking plate angle inspection Stacking plate angle measurement Plate geometry check Check the stacking plate angle against the approved geometry to support the specified layer engagement.
Page 11. BELT PRODUCTION Belt assembly and straightening Formed components Rod-and-spiral assembly Assembled belt Assemble the spiral elements, rods and stacking structure according to the approved drawing.
Page 12. BEFORE MASS PRODUCTION Trial production and first-article inspection Customized orders undergo trial production and first-article inspection before mass production. Use approved drawings for acceptance dimensions and tolerances.
Page 13. EQUIPMENT MATCHING Layer stacking and engagement verification Layer engagement detail Stacked belt arrangement Check engagement between adjacent belt layers before mass production. Stacking geometry follows the approved equipment and belt design.
Page 14. EQUIPMENT MATCHING Drum geometry verification Drum geometry arrangement Geometry measurement For applicable projects, verify approved drum geometry before mass production. Confirm belt width and stacking geometry together.
Page 15. FINAL QUALITY CONTROL Surface condition inspection Belt surface detail Finished belt surface Surface detail Inspect surface condition against the selected material and finish. Where treatment is specified, re-inspection follows treatment; selected treatments use external suppliers.
Page 16. FINAL QUALITY CONTROL Edge finish inspection Edge construction detail Finished edge detail Edge connection detail Inspect the selected edge construction for connection condition, consistency and burrs against the agreed requirements.
Page 17. FINAL QUALITY CONTROL Finished belt dimensional inspection Check finished belt dimensions against the approved specification. Measurement photographs show project examples, not universal belt dimensions.
Page 18. PACKING & SHIPMENT Protective packing and order identification Protected belt Packing and identification Prepared shipment Confirm belt protection, supplied accessories and packing requirements against the order before shipment.
Page 19. PACKING & SHIPMENT Wooden-case packing Packed shipment Wooden-case protection Packing follows the agreed transport route and destination requirements. Wooden-case fabrication uses external suppliers.
Page 20. TRACEABILITY Project records and repeat-order support Record Purpose for the buyer Approved drawing and revision Maintain the agreed specification for manufacture and reorders. Material and production records Support order traceability and review of manufacturing history. Inspection records and photographs Review recorded checks against the agreed requirements. Customer confirmations Retain technical decisions and approved changes. Agree the inspection documents you need before production. For replacement projects, include existing belt details, equipment geometry and operating conditions.
Page 21. PROVEN · STABLE · VERIFIED Metal Conveyor Belt Manufacturer Email: info@yiyimeshbelt.com Phone / WhatsApp: +86 134 5177 3742 Website: www.yiyimeshbelt.com www.yiyimeshbelts.com Company: Ningjin Yiyi Mesh Belt Co., Ltd. Send Your Drawing for Production Review Belt dimensions (mm / in) Equipment / drum geometry Material and operating conditions Stacking / inspection requirements Existing belt photos / sample Request an Engineering Review for OEMs & Professional Distributors