+86 134 5177 3742 info@yiyimeshbelt.com Mon - Fri 08:00 - 17:00 CST
Manufacturing experience since 1998 · Company established 2008 ISO 9001 Certified Factory Visits & Video Tours Welcome
Selection · Eye Link Belt

What Changes When Our Factory Builds a Heavy-Duty Eye Link Belt?

Heavy-duty eye link belts fail when they are built like light ones. Our factory sets link, rod and pitch from your old belt or drawing and confirms them on the drawing you approve before production. See our eye link belts.

Updated 2026-10-12Food plants, equipment makers, frying and cooking linesSunny Ye
Sunny Ye, Global Sales Director, YIYI Mesh Belt
Sunny YeGlobal Sales Director, YIYI MESH BELT · Follow on LinkedIn

Short answer

Choose a heavy-duty eye link belt by sizing the cross rod and rod pitch to the load, choosing the eye-link wire, adding reinforcing bars across wide belts, specifying a roller chain or reinforced plate edge for the drive, and matching sprockets. Each choice is recorded on the approved drawing.

Finished SUS304 eye link belt for a frying line
A reinforced eye link belt for frying.

I am Sunny Ye, Global Sales Director at YIYI MESH BELT in Ningjin, Shandong, China. Our manufacturing experience dates back to 1998. We build eye link belts up to 3,000 mm wide, many with reinforcing bars and roller chain edges.

At a glance

ProductEye Link Belt with sprockets
ApplicationFrying, cooking, freezing, heavy-duty conveying
Key parameters to confirmRod Ø and pitch, eye-link wire, reinforcement, edge, width, sprockets
Buyer typeFood plants, equipment makers
What to send for a quoteLoad per metre, width, temperature, drive and a photo of the old belt

How do you size the rod and pitch?

The cross rod carries the load across the width.

Size the cross rod and rod pitch from the load per metre and the belt width: heavier loads and wider belts need a thicker rod or a closer pitch. We use 5, 6 or 8 mm rods at 25.4 to 76.2 mm pitch.

Rod pitch checked on an eye link belt
Rod pitch checked on the belt.
DimensionRange
Eye-link pitch3.6 / 5 / 6 / 8 / 10.5 / 12 mm
Rod pitch25.4 / 50 / 50.8 / 76.2 mm or custom
Eye-link wire1.6 / 2 / 2.5 mm
Cross rod5 / 6 / 8 mm or custom
Width300–3000 mm

When do you need reinforcing bars?

Wide belts need strength across the span.

Add reinforcing bars across the belt when the width or the load would let the mesh bow between rods or supports, which is common on wide frying and cooking belts. The bars share the load across the span and keep the surface flat under product.

Reinforcing bar spacing checked
Reinforcing bars checked with a tape.

For a new potato frying line we added 2.5 × 12 mm reinforcing bars to belts up to 2,582 mm wide.

Which edge should a heavy-duty belt have?

The edge carries the pull.

A heavy-duty eye link belt usually needs a roller chain edge, which carries the drive through sprockets and keeps the mesh from taking the pull; a reinforced plate edge suits lighter drive loads. The chain pitch, rollers and sprockets are confirmed with the belt on one drawing.

Roller chain edge checked on an eye link belt
Roller chain edge, 50 mm pitch.

Sprockets are machined by partners to our drawing and checked against the belt by us before shipment.

How are sprockets matched?

Heavy belts are hard on sprockets.

Match sprockets by specifying tooth count, pitch, bore and width on the same drawing as the belt, and check them on the belt before shipment. On a new line, every sprocket set is machined to that drawing; on a replacement, worn sprockets should be replaced with the belt.

Sprocket measured for an eye link belt
Sprocket measured against the drawing.

For the frying line, five sprocket sets were machined to the same drawings as the belts and checked on the belt.

When this is not the right choice

A light eye link specification is not right for a wide frying belt; it bows and wears early.

Ordering belt and sprockets from separate drawings is not right on a heavy-duty line.

From our engineering experience

For a new potato frying line we built four eye link belts from customer drawings, 325 to 2,582 mm wide, with 5 mm rods at 50 mm pitch, reinforcing bars and a roller chain edge, plus five sprocket sets.

My advice: give us the load per metre and the width. The rod, the reinforcement and the edge follow from them.

Evidence from our work

Sprockets packed for shipment
New potato frying line · equipment project · 2024
Situation
Four SUS304 eye link belts and five sprocket sets for a new frying line.
What we checked
Eye-link pitch 6.5 mm, rod pitch 50 mm, rods 5 mm, eye-link wire 2.5 mm, reinforcing bars 2.5 × 12 mm, chain edge 50 mm pitch washer welded.
Why it matters
Wide frying belts need strength across the span and a chain edge for the drive.
Result
Sample approved, mass production, sprockets checked on the belt, measured photos before shipment.
Buyer lesson
Specify rod, reinforcement, edge and sprockets together for heavy duty.

See the project record →

FAQ

How wide can an eye link belt be?

300 to 3,000 mm, or custom.

Can you add reinforcing bars?

Yes, across the belt, on the approved drawing.

Do you supply sprockets?

Yes, specified on the same drawing and checked against the belt.

Which materials are available?

Mild steel, SUS304 and SUS316, chosen for the process.

Conclusion

Size rods to the load, reinforce wide belts, drive with a chain edge and match sprockets on one drawing. That is a heavy-duty eye link belt.

Useful files for your project

Sunny Ye
About the authorSunny Ye · Global Sales Director, YIYI MESH BELT

I work on metal conveyor belt projects, from new spiral freezers to belt replacement. I share project notes and replacement checklists on LinkedIn.

Technical reviewer: Sunny Ye, Global Sales Director, YIYI MESH BELT · Last updated: 2026-10-12

Still have a question about your belt?Send your drawing or photos of the old belt. Our production team reviews it and tells you whether it fits, what it costs, or what is still missing.